Home  ꄲ  Commercial Decoration Main Materials  ꄲ  Double-Layer Fire-Rated Acoustic Blinds Partition for Corridors

Double-Layer Fire-Rated Acoustic Blinds Partition for Corridors

Product SKU BD-105
Product Type Fire-Rated Acoustic Blinds Partition
Build Double-layer rated + blind glazing
Use Corridor Separation Walls
System Rated framed modules
Pricing Unit Per sqm
Available Sizes Module sizes per zone drawings
Ratings Per project fire specification
Add to quote
ꁆ ꁇ
낙Add to cart
Quantity: ꄷ ꄸ

Double-Layer Fire-Rated Acoustic Blinds Partition for Corridors

BD-105 is a double-layer blinds partition with fire-rated and acoustic performance for corridor separation. The build combines rated framing with blind glazing for escape-adjacent rooms.

Key Features

·       Double-layer build with fire-rated framing

·       Acoustic separation for corridor-adjacent rooms

·       Blind glazing inside a rated envelope

·       Rated hardware per door positions

·       Zone-labeled rated modules

·       Supply for corridor separation programs

Applications

·       Manager offices and executive suites requiring instant privacy control.

·       Open-plan workstation zoning with integrated blind cavities.

·       Meeting suites combining wood finishes with blind glazing.

·       Clinic and wellness rooms needing frosted or clear switching.

Specifications

Product SKU

BD-105

Product Type

Fire-Rated Acoustic Blinds Partition

Build

Double-layer rated + blind glazing

Use

Corridor Separation Walls

System

Rated framed modules

Pricing Unit

Per sqm

Available Sizes / Colors / Finishes

Available Sizes

Module sizes per zone drawings

Ratings

Per project fire specification

Product Family Comparison

Attribute

BD-101

BD-105

BD-110

Type

Magnetic-control double glazing

Fire-rated acoustic double layer

Standard system with door

Format

Double-glazed module per sqm

Fire-rated module per sqm

Standard module per sqm

Primary Use

Executive privacy

Corridor fire separation

Bulk office programs

Pricing Unit

Per sqm

Per sqm

Per sqm

Installation

·       Assemble blind cavities in clean conditions; dust inside glazing is not serviceable on site.

·       Magnetic and cord controls must be tested through the full tilt cycle before glazing closes.

·       Profile systems ship with assembly drawings; follow the cavity sequence to avoid rework.

Packaging & Shipping

Packing

Crated rated modules labeled per zone

Customization Options

Ratings and module layout follow the fire zone drawings; blind color per scheme.

Quality and Compliance

·       Applicable certificates and test reports must match the exact model, certificate holder, scope and validity before publication or order release.

·       Destination-market requirements for the selected SKU must be reviewed before order release.

FAQ

What information is needed for a quotation?

Provide the required model, specification, color, quantity, destination, packing preference and trade terms.

How does the blind cavity work in a rated wall?

Rated framing carries the build; blind glazing sits within the rated envelope per system scope.

Are rated documents available?

System test references issue per project; certificate scope must match the ordered configuration.

Request a Project Quotation

Send the required model, specification, color, quantity, destination, packing preference and trade terms to request a written quotation and sample plan.

Description

넳 넲
YOU MAY ALSO LIKE

 

Full-Range Building Materials